Specifications

2-6
Maintenance operation at startup
When the power on maintenance is valid, the operation below is performed depending on the status at
startup of this machine.
For the power on maintenance setting, refer to
P.4-17 "Perform cleaning automatically when the power
supply is turned on". (Supported from the firmware ver.2.00)
If hot water turned cool
1
Preparation for hot water starts.
If you wish to cancel cleaning, press the
key.
If you press the
key, cleaning is cancelled
and the screen becomes <LOCAL> display.
2
When water becomes hot enough,
cleaning starts automatically.
When the cleaning is completed, <LOCAL> is displayed
If “ERROR149” occurred at the previous startup
If “ERROR149 INK UPSTREAM GRD” occurred at the previous startup, perform the operation below.
1
Perform wiping to remove ink drop on
the nozzle surface.
When the wiping is completed, <LOCAL> is displayed
POWER ON MA I NTENANCE
NOT READY WATER
POWER ON MA I NTENANCE
CANCEL : en t
END
ENTER
CLEANING ACT I VE
*****---------------
WI P I NG
PLEASE WA I T