User manual
59
Calibrating the Flowrate, Continued
Procedure
(continued)
Step Action Diagram
5
x Select <Flow Calibration>.
x Press
.
6
x Place a 1 L Graduated
Cylinder under the Q-POD
Unit.
x Press
.
7
x Using the Q-POD Keypad,
press
.
8
x Water dispenses
automatically from Q-POD
Unit 1.
x Wait until it stops dispensing
water.
9
x Measure the amount of water
(in ml) that was dispensed.
x Suppose 870 ml was
collected.
x Input this using the Keypad.
Continued on next page