User manual
51
Installing a POD Pak
Overview
The installation of a POD Pak involves 2 steps. These are:
x placing and flushing the POD Pak onto the Q-POD Unit, and
x registering the installation of a specific POD Pak.
Placing and
flushing
Follow the instructions delivered with the POD Pak.
Registering
Follow the steps below to register the installation of the POD Pak.
Step Action Diagram
1 Start in STANDBY Mode.
2
x Select <Menu>.
x Press
.
3
x Select <Maintenance>.
x Press
.
Continued on next page