User manual

38
Main Cabinet tubings, cables and power cord, Continued
Reservoir
connections
The tubings from Milli-Q Cabinet Ports 7 and 9 are connected to the
Reservoir as shown here.
NOTE:
The valve where the tubing from Port 7 is connected must be opened.
Feedwater
tubing to pipe
x Install the feedwater tubing as shown here.
x Note that the assembly of fittings has a strainer inside.
x This is called the Inlet Strainer for Milli-Q for the remainder of this User
Manual.
Continued on next page