User Manual

Table Of Contents
3-14 Millennial Net
Running MeshScape Network Monitor
Configuring AD (analog-to-digital) Converter Operation
The following procedure describes the steps that need to be taken to set up the hardware and
configure an end node or mesh node for AD Converter operation (see
Figure 3-18):
1. Connect 0–3 VDC signals to the following A/D Converter connectors:
end node: Connect signal source ground to GND_CPU of the A/D Converter terminal
block.
mesh node: Connect signal source ground to Pin 1 (Ground) of connector SL4.
Use any or all of the A/D Converter channels (AD0–AD3/Pins 2–5) for connecting analog
signal sources.
2. From MeshScape Network Monitor, double-click on the desired device from the list of
discovered sensor nodes. The Device window is opened, displaying the device’s current
configuration.
3. From the AD Converter panel, select the AD Converter channels to which the external
analog signals have been connected, then select Update.
MeshScape Network Monitor displays the analog information for the node in the ADC
(V) column.
Figure 3-18. Configuring end node/mesh node for analog I/O
Connect 0–3 V signals
1
Select analog channels,
3
then Update
Double-click on device
2