User Manual

Table Of Contents
RK-5409-5 Reference Kit User’s Guide 2-7
Installing the Hardware
Mesh Node Setup (MN-5409)
The mesh nodes, model number MN-5409 (label with model number on bottom), are shipped
enclosed in cases that have openings for instant access to the antenna, and RS-232 connectors
as shown in
Figure 2-7.
Figure 2-7. Mesh node components
Installing antenna and applying power
To install a mesh node:
1. Attach one of the included antennas to the REV-SMA antenna connector. The antenna
screws onto the connector.
2. Connect one of the following power sources supplied with the kit:
Regulated AC Adapter (recommended): Plug the regulated AC adapter into a 110
VAC power source.
Batteries: For applications where a 110 VAC power source is not available, the
mesh node can be converted to a battery powered device. For instructions on
installing one of the battery packs contained in the kit, see
’Converting to battery
power’ on page 2-9.
Caution
When attaching the antenna, only hand-tighten the antenna to the connector.
Using excessive force may damage the connector.
REV-SMA Antenna Connector
Regulated AC Adapter
RF Activity LED
RS-232 Port
Online LED
Product Label with:
- Model Number
- GroupID
- Device ID