Assembly instructions
4. Install Front Cover
Install the Front Cover [A] - see Figure 4. Use following fasteners:
[E] M6x16 Bolt x 12 pcs;
[F] M6 Fender Washer x 24 pcs;
[G] M6 Spring Lock Washer x 12 pcs;
[H] M6 Nut x 12 pcs.
Important:
• Adjust the Front Cover [A] alignment cut at the bottom.
Alignment cut must match drainage bores;
• Do not tighten the fasteners rmly until all have been tted;
• M6 fastener tightening torque must be approximately 7 Nm.
5. Waterproof the Sleeve assembly
Use Silicone Sealant [L] to waterproof the part contact areas - see Figure 5.
Processing steps:
• Application method
Apply sealant evenly
and without bubbles.
Processing temp.:
from 5 to 40°C
Humidity: 30% min.
• Surface Cleaning
Degrease and dry the
contact surfaces.
• Preparations
Cut the nozzle to get
approximately
2.5mm opening.
• Joint Smoothing
Smooth the sealant
using plastic or
wooden tool soaked
in soapy water.
• Cleaning
Clean with white
spirit or similar uid
immediately after
use.
• Repair
Repair applying
similar silicone
sealant.
• Curing
Skin formation:
Ca. 10 -25min
Curing speed:
Ca. 2mm/24h
Leave the joints for
24h to cure.
F
G
H
E
F
A
D
FIG. 4
FIG. 5
L