Full Product Manual

5
5/16”-18 x 3/4" Bolt Grease Tube
5/16”-18 Keps Nut
1/4”-20 x 1/2" Flange Bolt
1/4”-20 Keps Nut
1D 1E 1G 1H
1M
SLIDE THE TROLLEY
ONTO RAIL SECTION “A”
PULLEY
HOLES
PUT NUTS ON BOLTS
WITH JUST A FEW TURNS,
DO NOT TIGHTEN NUTS
AT THIS TIME.
2 3
Slide the Trolley onto the rail Sections “A”. Be sure
of proper trolley orientation.
Attach the Pulley Assembly to rail Section “A” with
(2) 5/16”-18 x 3/4” bolts and (2) 5/16”-18 Keps nuts
(supplied). DO NOT FULLY TIGHTEN AT THIS TIME.
SECTION “C”
SPROCKET
FLAT SIDE UP
SPROCKET
HOLDER
APPLY
GREASE
APPLY GREASE
SECTION “C”
SECTION “C”
4
5
Install trolley stop using 1/4”-20 x 1/2” Flange
bolt and 1/4”-20 keps nut (supplied).
Apply grease to inside surfaces of sprocket holder
as shown and place the Sprocket into the sprocket
holder with  at side up, then place Sprocket Holder
onto rail Section “C”, as shown.
HARDWARE
RAIL ASSEMBLY – continued
Completed rail assembly.
1G
1H
1E
1D
1M