Instructions / Assembly
Diamond Dual Instruction Manual 9
Step 5 
After verifying that you have the best position for 
the post pivot bracket in the open position, insert 
the 5/16" x 1-3/4" bolt through the aligned holes of 
the post bracket and post pivot bracket to hold it in 
place. Remove the clevis pin from the front mount 
and while supporting the gate opener, swing the 
gate and gate opener to the closed position.
TIP: Turn the post pivot bracket over for more hole 
alignment options. You can also move the entire 
post bracket assembly to different positions on the 
post. 
Step 6
Be sure the position of the gate opener and brackets 
allows for 2” of clearance between the gate and the 
opener in both the open and closed positions (A), 
and maintaining a maximum distance of 15” from 
the clevis pin opening of the retracted opener arm to 
the gate bracket with the gate in the closed position. 
(B) see graphic to right. This mounting position will 
give the opener the most efficient leverage point 
for operation and provides the least possible pinch 
area.
Again, check the clearance and be sure that the gate 
opener is not binding at the post pivot bracket.
If you don't have the required clearance, or if the gate opener  is 
binding on the post pivot bracket, remove the 5/16" x 1-3/4" bolt and 
readjust the post pivot bracket. 
Step 7 
When the post bracket assembly is in the optimum position for clearance and freedom of movement, 
reattach the opener to the gate bracket (gate in the open position); recheck the gate opener level; make 
sure the brackets are clamped securely. Secure the 5/16” x 1-3/4” bolt with a 5/16” washer and 5/16” nut.
Step 8 
Mark reference points for bolt holes on the post through middle of 
post bracket assembly slots. Mark reference points for bolt holes on 
the gate cross member through middle of gate bracket slots. After 
marking your reference points, remove the opener and brackets from 
the fence and gate.
Gate in the
CLOSED POSITION
Pinch Area
Gate in the
OPEN POSITION
Pinch Area
2" minimum
2" minimum
Be sure gate opener 
and bracket don't bind.
MAX 15"
5
/16" x 1
3
/4"
Bolt
Post Pivot
Bracket
Determine Best
Hole Alignment
to Achieve
2" Clearance
Post Bracket
5
/16" Nut
5
/16" Washer
Post Bracket
Assembly
Mark gate post through 
middle of bracket slots
and drill 3/8" holes
Gate In Open Position 
LEVEL horizontal cross member
Mark cross member through middle of
gate bracket slots and drill 3/8" holes 
(A)
(B)










