Installation Guide

MM571W / MM572W Installation Instructions 1514 MM571W / MM572W Installation Instructions
CONTROL BOX INSTALLATION CONTROL BOX INSTALLATION
If installing an optional second battery, connect the battery
harness as shown in Step 3.
Place the second battery and route harness as shown.
Identify a suitable mounting location for your control
box at least 3 ft. from the ground and no more than 4 ft.
from the primary operator.
With the 7/32” drill bit, drill through the eight control
board panel access holes labeled “B”.
Locate and knock out the battery cable access hole in
the panel.
Feed the battery cables through the control board
casing access hole.
Attach the control board casing using the eight screws
provided.
NOTE: Figure does not display the control panel cover.
The cover will be attached on hinges.
Once you’ve identied a suitable mounting location,
mount the battery box using the supplied wood screws.
If the mounting surface is not wood, additional hardware
may be required (not supplied).
Connect the battery harness to the battery as shown -
red to positive, black to negative terminals.
Place the battery into the right side of the battery box
with the terminals facing to the right and towards the top
of the battery box.
Route the battery harness as shown.
Install the Antenna by screwing it in place on the
SMA connector.
Orient the antenna to the sky, and securely tighten.
DANGER/POISON
DANGER/POISON
CONSTANT VOLTAGE CHARGE
Feed battery cables through access hole
W
R
OR
R
Attenna
Cable
3’ Min.
3’
Min.
4’
Max.
Step 4Step 1
Step 5
Step 2
Step 6Step 3
Note: If you intend to install and use the MMS100
Wireless Connectivity System (sold separately) with your
gate operator, consider mounting your control box as
high as possible to improve radio performance.
Note: Orient the battery box with the arrow on the inside
of the box pointed up.