Product Manual
18 MM562 Installation Instructions
Step 3
Attach a vertical closed position stop plate to the SECOND
gate.
Using appropriate hardware for your type of gate attach
the vertical closed position stop plate to the SECOND gate
frame at the point where it will come in contact with the
ground stop post.. Do not tighten it completely at this time.
You must slide the closed position stop plate toward the
ground stop until they touch (Illustration C). Once you
have moved the stop plate to the correct position, tighten its hardware completely.
Step 4
Reinstall the master gate operator (6 foot cord) on the side of the gate where you plan to install the control box. Reinstall the
second gate operator (32 foot cord) on the opposite side.
NOTE: For a push-to-open installation (gate opens out from the property) attach the closed position stop plate to the outside
of the gate.
Post Bracket Assembly
Gate Bracket
MASTER Gate Opener
Closed Position
Positive Stop Plates
SECOND Gate Opener
OPTIONAL Closed Position
Ground Stop Post
Step 2
Install a low prole ground stop (not provided) beneath the
SECOND gate stop plate.
The ground stop needs to be positioned near the end of the
gate as shown in Illustration A and may be made of metal
or concrete and should be rmly secured in the ground (we
recommend setting it in concrete).
Closed Position Stop Plate mounted
on the gate leaf that CLOSES FIRST
Closed Position Stop Plate
Low Profile Ground Stop
in Near the Center of Driveway
FRONT VIEW
SIDE VIEW
Mount Vertically
Illustration C
At this stage of the installation, the openers should be installed on the
gate leaves and the open and closed position stops should be in place.