Installation Guide
23 MM560 Installation Instructions
Solar Panel Installation
Winter Ratings Zone 1 Zone 2 Zone 3
12 v single gate (10 watts) solar charger8 16 26
12 v single gate ( 5 watts) solar charger 4 8 13
12 v single gate (15 watts) solar charger 11 20 30
12 v single gate (20 watts) solar charger 14 28 38
12 v single gate (25 watts) solar charger 17 36 46
12 v single gate (30 watts) solar charger 20 44 54
The table and map illustrate the
maximum number of gate cycles to
expect per day in a particular area when
using from 5 to 30 watts of solar
charging power, prior to the battery
depleting to a state where the unit will
not function (see accessory pages in
back of this book). The figures shown
are for winter (minimum sunlight) and
do not account for the use of any
accessory items. Accessories connected to your system
will draw additional power from the battery.
NOTE: A minimum of 5 watts of solar charging power is
required for Mighty Mule single gate systems, with a maximum
of 30 watts. A second battery 12V 7Ah, tractor, automotive or
deep cycle marine battery is recommended for solar and/or high
traffic applications, if needed. See Solar Panel Installation
Instructions for further information.
(Optional)
Toward
Equator
1
The solar panel must be positioned facing the path of the sun
and in an open area away from shade. It should receive at least 8
hours of direct sunlight for a full charge.
IMPORTANT: Mount the panel using
the curved pipe provided to maintain
the proper angle to the sun.
15
FUSE
BAT T+
BAT T-
1 2 3 4
ON
STATUS
LEARN RMT
RECEIVER
LEARN
MAST LIMIT
LEARN
SLV LIMIT
S3
S4
ALM
S2
OFF
SOFT START OFF
WARNING OFF
OPEN PULL
SLV OPEN DLY.
MODE1 OFF
MODE2 OFF
ON
ON
PUSH
SIMULT.
ON
ON
120 MIN MAX
CHARGING
PWR IN
GTO RCVR.
WHT
BLU
BRN
ORG
RED
BLK
GRN
WHT
BLU
BRN
ORG
RED
BLK
GRN
COM
GRN
BLK
RED
CYCLE
SAFETY
EXIT
SHADOW
OPEN
EDGE
COM
GTO
TRANSF
LOCK
PWR
AUX
RLY
POWER
INPUTS
CONTROL
INPUTS
MASTER CABLESLAVE CABLE
CONTROL INPUTS
AUTO CLOSE TIME STALL FORCE
CLOSE
EDGE
18 VAC
or
SOLAR
GTO
LOCK
AUX
1 2 3 4 5 6 7
DIAG
PORT
2
10”
IMPORTANT: Requires 8 hours
of direct sunlight a day.
Feed 10” of wire from solar panel into box through the pre-
drilled hole in the bottom of the control box.