Installation Guide
  MM560 Installation Instructions 20
RECEIVER
LEARN
SLV LIMIT 
S4
ALM
CHARGING
PWR IN
GTO RCVR.
WHT
BLU
BRN
ORG
RED
BLK
GRN
WHT
BLU
BRN
ORG
RED
BLK
GRN
COM
GRN
BLK
RED
CYCLE
SAFETY
EXIT
SHADOW
OPEN
EDGE
COM
AUX
RLY
MASTER CABLESLAVE CABLE
CONTROL INPUTS
CLOSE
EDGE
1 2 3 4 5 6 7
WHT
BLU
BRN
ORG
RED
BLK
GRN
MASTER CABLE
7
WHT
BLU
BRN
ORG
RED
BLK
GRN
COM
CYCLE
SAFETY
COM
MASTER CABLE
CONTROL INPUTS
Correct
Wrong Wrong
8
Secure wires in terminals.Insert 7 wires into corresponding color terminals.
CAUTION: Please 
call your power company 
before you dig. Failure to 
do so could cause injury 
or even death.
10
Top View
Min 3 Ft
Max 1,000 Ft
GTO Transformer
Mounts Here
9
Locate power outlet and identify wire path to control box.
NOTE: If OUTLET is OUTSIDE use weatherproof cover.
Dig trench and lay wire from AC power source to control box. 
Use only 16 gauge multi-stranded, low voltage, PVC sheathed 
wire (RB509). NOTE: DO NOT use telephone wire or solid core 
wire. NEVER splice wires together. We recommend running wire 
in PVC conduit.
Transformer Wiring Installation
If usIng optIonal solar panel charger Instead of transformer, go to page 23.
Important: d
o not connect both solar panel and transformer.
Control Box Installation
Control Box Installation
WARNING
Before digging contact local authorities to locate underground utilities such as electric and gas service.










