Installation Guide
2 MM371W / MM372W Installation Instructions MM371W / MM372W Installation Instructions 3
S
E
S
F
B
N
N
!
G
L
O
F
G
V
T
S
F
B
S
E
N
!
G
L
O
F
G
T
Minimum 80˚ Open
N
S
F
B
S
E
N
!
G
L
O
F
G
T
N
PULL-TO-OPEN OPERATOR MOUNTING 
(
MOST COMMON
)
PULL-TO-OPEN OPERATOR MOUNTING
 ● Assemble the gate post bracket sub 
assembly as displayed.
 ● Attach the gate post bracket 
subassembly and gate bracket to the 
operator as shown.
 ● Disconnect the operator arm from 
the gate bracket.
 ● While supporting the operator, 
swing the gate and operator to the 
closed position. 
 ● Check for recommended 
clearances and binding as shown. 
 ● Ensure that the necessary arm 
stroke does not exceed 17 inches.
 ● Make adjustments to the 
mounting brackets to achieve the 
recommended clearances. 
TIP: Turning the pivot bracket over 
gives more hole alignment options 
for the gate post pivot bracket 
assembly.
 ● With the gate in the OPEN 
position, use clamps to secure 
the operator to the gate post and 
center cross member of the gate. 
 ● Ensure that the operator is level. 
 ● With the operator arm temporarily 
secured to the gate, check 
to ensure there is at least 2 
inches of clearance between 
the operator arm and gate. (See 
illustration in Step 4 below).
2" Min. - Pinch-Point Clearance
Top View
2" Min.
17" MAX.
2
1
Closed
Position
Open
Position
Step 1
Step 2
Step 3
Step 4
Your Property Your Property










