Instructions / Assembly

16 MM371W / MM372W Installation Instructions MM371W / MM372W Installation Instructions 17
CONNECTING THE OPERATOR(S) AND BATTERY TRANSFORMER OR SOLAR PANEL WIRING INSTALLATION
Correct
Wrong Wrong
Locate the PRIMARY operator wiring
terminals, and insert the wires into
the corresponding color terminals.
Tighten the screw terminals
ensuring the wires are captured
correctly as shown.
Step 3
Step 4
C
GRN
WHT
BAT+
AUTO
CLOSE
RESET
PULL
STAGGER
WARNING
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
COM
COM
CYCL
SAFE
EXIT
SHDW
AUX
V+
AUX
V-
LOCK
V+
LOCK
V-
CLOSE
EDGE
OPEN
EDGE
PRIMARY
SECONDARY
LOCK AUX
SW1
SW2
PUSH
12345
+
TERM6
GRN
WHT
BAT+
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
AUX
V+
AUX
V-
PRIMARY
SECONDARY
SW1
SW2
TERM6
Battery Power Access
Connect the battery power wires:
Red to Red (BAT+) and Black to
Black (BAT–).
WARNING
Before digging contact local authorities to locate underground utilities such as electric and gas service.
Step 1
Step 2
Locate power outlet and identify wire
path to control box.
If installing a solar panel (FM123 sold
separately), see solar panel instruction
manual and skip to Step 3.
Note: If your outlet is outside, use a
weatherproof cover.
Along the identied path between outlet and control box, dig a trench to lay the low voltage transformer wire (RB509 sold
separately).
Use PVC conduit from the ground up to the control box.
CAUTION: Please
call your power company
before you dig. Failure to
do so could cause injury
or even death.