Instructions / Assembly
16 MM371W / MM372W Installation Instructions MM371W / MM372W Installation Instructions 17
CONNECTING THE OPERATOR(S) AND BATTERY TRANSFORMER OR SOLAR PANEL WIRING INSTALLATION
Correct
Wrong Wrong
● Locate the PRIMARY operator wiring
terminals, and insert the wires into
the corresponding color terminals.
● Tighten the screw terminals
ensuring the wires are captured
correctly as shown.
Step 3
Step 4
C
GRN
WHT
BAT+
AUTO
CLOSE
RESET
PULL
STAGGER
WARNING
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
COM
COM
CYCL
SAFE
EXIT
SHDW
AUX
V+
AUX
V-
LOCK
V+
LOCK
V-
CLOSE
EDGE
OPEN
EDGE
PRIMARY
SECONDARY
LOCK AUX
SW1
SW2
PUSH
12345
+
TERM6
GRN
WHT
BAT+
BAT–
GRN
WHT
BRN
ORG
BRN
ORG
RED
BLK
RED
BLK
AUX
V+
AUX
V-
PRIMARY
SECONDARY
SW1
SW2
TERM6
Battery Power Access
● Connect the battery power wires:
Red to Red (BAT+) and Black to
Black (BAT–).
WARNING
Before digging contact local authorities to locate underground utilities such as electric and gas service.
Step 1
Step 2
● Locate power outlet and identify wire
path to control box.
● If installing a solar panel (FM123 sold
separately), see solar panel instruction
manual and skip to Step 3.
● Note: If your outlet is outside, use a
weatherproof cover.
● Along the identied path between outlet and control box, dig a trench to lay the low voltage transformer wire (RB509 sold
separately).
● Use PVC conduit from the ground up to the control box.
CAUTION: Please
call your power company
before you dig. Failure to
do so could cause injury
or even death.