Product Manual B
MM-LPS13 Installation Manual 7
rev 05.16.13
DETERMINING OPERATOR MOUNT POSITION
Concrete
Concrete
Level
Plumb
Quick
Release Pin
String
Chain Bracket
Chain Bracket
String
Quick
Release Pin
(Outside bracket
adjustment slot)
Step 1
Be sure the gate is properly installed and slides smoothly before installing the MM-LPS13 .
The gate must be plumb, level, and move freely. The gate must not bind or drag on the ground.
Neveruseawheelonthegate,becausetheadditionaldragandresistancecancausetheoperator
to obstruct.
Step 2
Install chain brackets at each end of the gate on the inside (operator side) of the gate. Hand
tighten U bolts to allow for later adjustment (if necessary). Attach string to quick release pins and
install quick release pins in the chain bracket slot farthest from the gate.
Concrete
Concrete
Level
Plumb
Quick
Release Pin
String
Chain Bracket
Chain Bracket
String
Quick
Release Pin
(Outside bracket
adjustment slot)