Installation manual

34
Step 3
With the gate in the
fully closed position
and the opener retracted, swing the opener to the gate. Mark reference points for
bolt holes on gate cross member through middle of gate bracket slots. The opener must be level. (Some vertical adjustment
is possible by sliding the post bracket assembly up and down.) Drill
3
/
8
" holes into the gate cross member as marked. Fasten
gate bracket to cross member using (2) 3/8" x 3" bolts, washers, lock washers, and nuts. Attach the opener to the post bracket
assembly and gate bracket using clevis pins, bushings, and hairpins clips.
Step 4
Make sure the control box power switch is
OFF
. Use a small
screwdriver to move the
Number 1
DIP switch from the factory setting
(OFF / Pull-To-Open) to
ON for Push-To-Open
. Turn power switch
ON
. The control board is now confi gured to
push
the gate open.
Setting the Open Position Limit
Step 1
Confi rm that the power switch is in the ON position, and the gate is in the CLOSED POSITION.
Step 2
Activate your opener by pressing the entry transmitter button. Your gate should now be moving from the closed position
toward the open position. Prepare to STOP gate by pressing the entry transmitter button again when the gate reaches the
desired open position. This step may be repeated until desired open position is achieved. Once the desired OPEN position has
been achieved, proceed to Step 3.
Operator
Fence Post
Gate Post and Gate Cross Member
(In Closed Position)
POST PIVOT BRACKET level with the
horizontal surface of the GATE BRACKET
LEVEL
LEVEL
LEVEL
1
ON
2 3 4
15
CHARGING
POWER
STATUS
RF
PULL-PUSH
MODE
1
MODE
2
LOCK/BEACON
OFF 120
MIN MAX
STALL FORCE
CLOSE TIME
SET
LIMI
T
LEARN
REMOTE
AU
X OUT
SOLAR
PANEL
18VAC
RCVR
GRN
BLK
RED
EXIT
SAFETY
EDGE
CYCLE
COMMON
LINK
1
ON
2 3 4
PULL-PUSH
MODE1
MODE2
LOCK/BEACO
N