Installation manual

21
DIP Switch Settings for Dual Gates
Step 26
The four control board DIP switches match the openers
with the type of gate on which they are installed. For
example, a dual gate may pull-to-open or push-to-open.
Prior to packaging, the Mighty Mule Gate Opener
®
control board was configured for a single swing gate that
pulls-to-open (opens into the property). You must adjust
the DIP switches so the control board will recognize and
activate both openers. The DIP switches must also be
adjusted to control the order in which your dual gate
leaves open and close ("gate sequencing"). If you do not
adjust the DIP switches, your Mighty Mule Gate
Opener
®
may not function correctly.
R
E
D
B
LK
O
R
G
B
LU
G
R
N
C
LS
E
D
G
O
P
N
E
D
G
R
E
D
G
R
N
O
R
G
B
LU
W
H
T
B
L
K
O
R
G
B
LU
G
R
N
C
L
S
E
D
G
O
P
N
E
D
G
LEARN
AUTOCLOSE
INERTIA
STATUS
P
U
LL
/P
U
S
H
S
N
G
L
/D
U
A
L
S
E
Q
1
S
E
Q
2
MIN
MAX
MIN
MAX
OFF
60
120
BATT
+
OBSTRUCT
SENS.
RCVR
R
B
G
ALARM
SECOND OPERATOR
FIRST OPERATOR
POWER IN
18VAC SOLAR
~ ~ – +
ACCESSORY
PW
R. SW
.
1234
ON
OBSTRUCT
SENS.
PULL/PUSH
SEQ1
SNGL/DUAL
SEQ2
LEARN
DIP switches
MIN MAX
NOTE: To change the DIP switch settings, you must turn the control box power switch OFF;
move the switch; then turn the power back ON. Use a small screwdriver to move the switches.
PULL/PUSH: Set to PULL for swing gates that pull-to-open [factory setting]; PUSH for swing gates that push-to-open (see
Push to Open Installation on page 32). NOTE: The direction a gate opens is determined by standing inside the fenced
property and facing toward the gate.
SNGL/DUAL: Set to SNGL for a single gate leaf [factory setting]; DUAL
for dual gate leaves.
Move this DIP switch to DUAL (see illustration at right). If this DIP switch
is set to SNGL, the opener connected to the SECOND OPERATOR
terminal block will not function.
SEQ1: Controls the order of operation for dual gate leaves.
(the factory setting is OFF).
SEQ2: Controls the order of operation for dual gate leaves.
(the factory setting is OFF).
You determined the opening and closing order of your gate leaves when you mounted the positive stop plates on your gate.
Review the Installation of the Positive Stops section on page 16 before setting the SEQ1 and SEQ2 DIP switches.
PLEASE NOTE: The terms "FIRST OPERATOR" and "SECOND OPERATOR"
refer to a unit wired to the terminal block of the same name.