Operating instructions/Installation instructions
Table Of Contents
- Contents
- Guide to the manual
- Proper use
- IMPORTANT SAFETY INSTRUCTIONS
- Product description
- User profiles
- Operation tips
- Commissioning
- Opening and closing the door
- Filling the salt container
- Adding rinse aid
- Application technology
- Operation
- Additional functions
- Program chart
- Settings
- Additional settings
- Cleaning and care
- Frequently asked questions
- Frequently asked questions
- After sales service
- Installation instructions
- Caring for the environment
- Installation
- Electrical connection
- Plumbing
- Technical details
Electrical connection
*INSTALLATION*
114
Peak-load negotiation
The Commercial Dishwasher is suitable for use in an energy
management system. For this purpose, it must be technically adapted
and the controls reset by Miele Technical Service.
Please contact Miele Technical Service for further information.
Peak-load
management
In the event of a peak load cut-out, some components of the
Commercial Dishwasher such as the heater element will be switched
off for a while. The Commercial Dishwasher will remain on during this
period and the current program will not be interrupted. If one of the
components that is switched off is needed during the current
program stage, the program cycle time will simply increase for the
duration of the load cut-out.
The third line of the display will alert you to the peak load cut-out, for
example:
Normal Plus
Temperature
Peak load cut-out
55 °C