Operating instructions/Installation instructions
Installation
*INSTALLATION*
67
Installation – flush-fit
If the worktop is more than 28mm
deep, it must be cut out underneath
on the building-in side on the right or
left hand side.
a
Worktop
b
Maximum 24mm
c
12mm
Securing the brackets
1bracket (supplied with the spacer bar)
must be secured centrally to the right or
left-hand side of the cutout.
Wooden worktops
Fit the bracket so that it sits flush
with the top edge of the lower step of
the stepped cutout.
Secure the bracket with the
3.5x25mm wood screws supplied.
Natural stone worktops
You will need heavy-duty double-
sided tape (not supplied) to secure the
bracket.
Stick the tape onto the upper edge of
the lower step of the stepped cutout.
Fit the bracket so that it sits flush
with the top edge of the lower step of
the stepped cutout.
Press the bracket firmly into position.