Operation Manual
Building-in dimensions
31
Flush-fit installation
a
Front
b
Fan (in the plinth on the floor)
c
Stepped cut-out (for detailed illustra-
tions, see “Worktop cut-out for flush-
fit installation”)
d
12mm wooden frame (not supplied,
for detailed illustrations, see “Work-
top cut-out for flush-fit installation”)
e
Air duct
f
E-box