Technical data

71
CS 1018 G
1. Front
2. Building-in depth
3. Mains connection box with mains connection cable,
L = 2000 mm
4. Gas connection R 1/2 - ISO 7-1 (DIN 10226)
CS 1421 S
1. Browning unit, height adjustable
2. Mains connection box with mains connection cable,
L = 2,000 mm
CS 1327 Y
1. Front
2. Height for building in
3. Mains connection box with cable, 2000 mm long
CS 1312 BG
1.Front
2. Height for building in
3. Minimum installation depth mains connection box
with cable, 2000 mm long
4.Drainage valve (allow for access)