Installation Instructions

2 - 2
6
7
4
Place the bath on two wooden blocks over the waste
connections. Connect the waste. Fill the bath with water and
check for leaks from the waste before removing the blocks.
5
4x
Place the wedges in position.
24H
The wedges can now be
disposed of.