Installation Instructions

6
PLUMBING ROUGH-IN
The bath waste opening protrudes below the base approx-
imately one inch. You may be required to cut a hole in the
subfloor to accommodate bath waste. In slab on grade or
prestressed concrete floors where cutting is not desired, the
tub may be raised up by building the platform higher and us-
ing extra mortar under the tub. If a joist must be notched,
verify that structure will not be weakened. Remove only what
is necessary. Provide supply pipe, rough-in waste and vent
per code.
PLUMBING
PVC Schedule 40 piping, self draining pump and fittings come
completely preplumbed unless requested otherwise. The
pump and whirlpool system are completely contained within
the tub perimeter. On some models, the pump may exceed
beyond the perimeter of the tub. If you have such a model,
please make allowances during installation.
INCOMING POWER
ELECTRICAL
Factory wired for 110 Volt 20 Amps. Ground Fault Circuit Inter-
rupter (GFCI) is required. The GFCI breaker must not supply
any other circuits or devices.
FINISHING
Before finishing with your choice of material, make sure
access entries are available to the pump, bath waste, and
plumbing fixtures. Finish as desired and seal around tub, pref-
erably with silicone.
NOTE:
1. For Caulking, we recommend 100% sanitary silicone
rather than latex.
2. For quieter operation, you may choose to insulate the
construction area.
3. IT IS THE INSTALLERS RESPONSIBILITY TO SUPPLY
ACCESS TO PUMP AND EQUIPMENT
REMINDER: During construction, we suggest that you cover
tub to avoid use as trash receptacle.
NOTE: To service the pump, blower and other electrical com-
ponents the caulking must be removed. Afterwards the skirt
should be cleaned and caulking reapplied.
Standard GFCI 110V, 20 Amps
Blower Electrical Supply
INSTALLATION CONTINUED