Assembly Instructions

TABLE OF CONTENTS
4
PREPARE
Prep - Level 2
ASSEMBLE:
Level 3 - Level 4
Finished Elevations
ENJOY:
Use and Care Instructions
More Concrete Block Ideas
5
6
PLANTER DIMENSIONS
7
8
9
* Do not over apply adhesive. It may reduce effectiveness. Use mineral spirits to remove any unwanted adhesive.
PREPARE:
Materials List
Check List & Guidlines
2
3
7 4-1/2
1’-8
7 4-1/2
TECHNIQUES
Fasten each layer of block together with
1/4” - 3/8” bead of construction adhesive on all
adjacent block faces unless otherwise
noted. Refer to the construction adhesive’s
application instructions for proper use.
INSTALLATION INSTRUCTIONS
* Do not over apply adhesive. It may reduce effectiveness.
Use mineral spirits to remove any unwanted adhesive.
Follow suggestions on page 3 to build a proper foundation before starting your new project. If not
already set, place the rst level of block 1- 2” below grade, level and ll in any gaps. Use Level 1
as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to adhering
each level to the previously laid block, place the entire level of blocks and check to make sure it
ts properly. Remove small sections at a time to place the adhesive.
Let adhesive dry for a minimum of two days.
Notice the Catlina Guide on the following pages. This will help you see which blocks will
be used on each level. Not all shapes of Catalina blocks will be used on each level.