Assembly Instructions
Prepare
4
TABLE OF CONTENTS
Prep - Level 2
ASSEMBLE:
Level 3 - Level 4
Level 5 - Pond Liner
Finished Elevations
ENJOY:
Use and Care Instructions
More Concrete Block Ideas
5
6
7
8
9
10
11
12
13
Pond Pump - Pond Liner
FOUNTAIN DIMENSIONS
Level 6 - Level 7
Level 8 - Level 9
Level 10 - Level 11
14
15
16
Level 12 - Level 13
Flagstone - Keystone
Follow suggestions on page 3 to build a proper foundation before starting your new project. If not
already set, place the rst level of block 1”- 2” below grade, level and ll in any gaps. Use Level 1
as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to adhering
each level to the previously laid block, place the entire level of blocks and check to make sure it
ts properly. Remove small sections at a time to place 1/4”-3/8” bead of adhesive.
INSTALLATION INSTRUCTIONS
- Do not over apply adhesive. It may reduce effectiveness. Use mineral spirits to remove any unwanted adhesive.
PREPARE:
Materials List
Check List & Guidelines
2
3
4
Project Dimensions
- All dimensions given are approximations. Always build with what you have. Your measurements may vary during
the assembly due to the organic shape of individual blocks as well as nal glue expansion.
4’4”
4’8”
3’10”