Assembly Instructions
Assemble
10
Concrete Counter tops
Thickness of counter tops are 2”
The counter top form needs to be constructed out of ¾” white melamine using 1½” drywall screws to secure the sides to the bottom
piece. Pre-drill and countersink all holes before fully assembling forms to avoid possible splitting and separating of the melamine
material. If any pieces bubble out, crack, break or show any imperfection, start over with a new piece. Screws should be on the side
of the frames when complete. This will allow for easy extraction when it comes time to remove the concrete from the form. Any
inside corners must be cut at 60 degree angles to continue the melamine material on all edges; exposed wood may bind to concrete,
leaving a rough surface, for around the inside of the frame, use black silicone caulk to apply a nice uniform concave bead to create a
smooth radius on the edges of counter top. Be sure to remove any excess caulk.
Verify all dimension will what is build. The size of you project may very slightly, so please check that all dimensions work. If there
are any discrepancies please make necessary changes. Do not build your frames until your bar is done. This will allow you to get
accurate dimensions for your counter tops.
Refer to the attached manufacturer’s installation instructions for further information.
1’ 6”
1’ 6”
1’ 6”
1’ 6”
1’ 6”
1’ 6”