Assembly Instructions
4
TABLE DIMENSIONS
TABLE OF CONTENTS
Materials List
Tool Check List
Foundation Guidelines
Level 1 - Level 2
Level 3 - Level 6
Level 7 - Level 10
Level 11 - Level 14
Level 15 - Level 17
Level 18
Finished Elevations
Use & Care Instructions
2
3
3
5
6
7
8
9
10
11
12
Follow suggestions on page 3 to build a proper foundation before starting your new project. If not
already set, place the first level of block 1”- 2” below grade, level and fill in any gaps. Use Level 1
as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to adhering
each level to the previously laid block, place the entire level of blocks and check to make sure it
fits properly. Remove small sections at a time to place the adhesive.
Once all levels are complete, clean off any unwanted surface residue with a damp cloth. Wait a
minimum of two days before using the table.
INSTALLATION INSTRUCTIONS
TECHNIQUES
Fasten each layer of block together with
¼” - ⅜” bead of construction adhesive on
all adjacent block faces unless otherwise
noted. Refer to the construction adhesive’s
application instructions for proper use.
* Do not over apply adhesive. It may reduce effectiveness.
Use mineral spirits to remove any unwanted adhesive.