STEP 4. BACK WALL FRAME STEP 5. FRONT WALL FRAME
STEP 6. SIDING BACK WALL STEP 7. SIDING FRONT WALL
Using one frame selected as an end wall, measure and mark stud locations according to dimensions
shown in gure 2. Place the proper length 2×4 studs at those locations. Mark required length and
angles. Cut each 2×4 to t. Toe nail studs into place using (2) 8d nails top and bottom. Using another
frame for the front wall use gure 3 as a guide.
Put the frame on a at surface and attach (3)
4'×8' sheets, up 1" from the end of the treated
member. Mark and cut to t (2) 4'×8' sheets
for the peak as shown in gure 4. Remaining
pieces are needed for the front wall peaks.
Use 6d nails every 8" on center.
With the front frame on a at surface, place the
remaining pieces from step 6 on the peak. Trim
ush to t and nail in place. Use the remaining
piece for the corner areas. From a 4×8 sheathing
sheet cut to t sides of doorway. Fasten with 6d
nails every 8" on center. See gure 5.
NOTE: Some siding pieces will need to be butted together, so a straight cut is necessary.
To keep moisture from “wicking” and soaking into the siding, keep the bottom of the siding
1" above the bottom of the treated bottom frame member.
Figure 2 Figure 3
Figure 4 Figure 5
48"
48"
48"
24"
18" 18"
86½"
24"
48"
48"
1" 1"
Trace frame.
Cut lines.
Trace frame.
Cut lines.
3½"
2½"
18¾"
11"
91¾" 91¾"
108"
96" 96"
1" 1"
18¾"20½"20½"20½" 20½"
2×4×8' end
wall studs
cut to t.
2×4×8' end
wall studs
cut to t.
Nail studs
into place.
Nail studs
into place.
2×4 studs and
2×4×12' nailer
cut to t.
2×4 studs and
2×4×12' nailer
cut to t.
2×4×10' nailer
cut to t.
Corner
pieces.
Front
Peaks
Back
Peaks