Installation Instructions
Step 6.1 - Stepping a Wall
When building your wall with the Clifton, a
Corner Block in conjunction with a Step/Cap
may be used to end a course that steps-up.
Step 6.2 - Add Step/Caps to Finish
the Top of Your Walls
Step 5 - Successive Course Installation
Before adding successive courses, each block
needs to be clean and free of foreign material.
Center the block and pull it forward until the
rear lip abuts the two blocks below it. Place
core and drainage fill as in Step 4. Place the
backfill material behind the drainage rock in
maximum 3" to 6" lifts based on the rating
of your compaction equipment and compact
to 95% Standard Proctor Density. Repeat this
process for each successive course. Large
compaction or construction equipment should
be kept a minimum of 3' from the back of the
wall. This 3' area should be compacted with a
vibratory plate compactor.
CRESTONE
®
BEVELED