Installation Instructions

INSTALLATION OPTIONS
Paver Base / Step 1
Leveling Sand / Step 2
Paver Locking Sand / Step 3
Install paver stones over a firm, stable base using one of the four installation diagrams shown below. If
installing Paver Locking Sand on a non-drainage bed system, there must be a slope to avoid water pooling
on the paver stones. Paver Locking Sand is the 3rd part of a 3-step standard installation system when
installing paver stones. By using Step 1 Paver Base, Step 2 Leveling Sand, and Step 3 Paver Locking Sand,
you will achieve the best results. Paver stone surface must be dry and clean prior to application of Step 3
Paver Locking Sand to prevent materials from adhering to and hardening on top of the paver stones.
PAVER STONE INSTALLATION STEPS