Owner`s manual
10 ©2001
MIDWEST FASTENERS, INC.
—
CD 50 Stud Welder
CD50 SETUP
After installation, two setup phases must be completed before welding can
begin. These phases are:
• Weld Gun Setup, and
• Controller Adjustment.
Your weld gun setup will depend on your application and the particular
stud to be welded. Setting up the gun consists of the following:
1. Locate the pins (or studs) that were shipped for your job and place a
pin into the weld gun Collet with the “weld tip” protruding. Push this
pin in until it seats firmly, assuring that the flange (or collar) of the
weld end does not come into contact with the collet.
2. Make sure that the gun “setup” accessories that came with the CD 2
weld gun are adjusted properly and fastened tightly. Illustrations on
the following pages for:
• Insulation Pins (Figure 1)
• Insulation Pins with Collet Protector (Figure 2)
• Insulation Pins with Internal Stop (Figure 3)
•Weld Studs (Figure 4)
NOTE: These components may need to be readjusted, or changed, as
your job requirements change.
WELD GUN SETUP










