E-Panel Manual
E-Panel Instructions (continued)
9 | P a g e 1 0 - 0 0 3 - 1 R E V : J
You can make life a little easier by installing additional breakers for charge control, the inverter
and such while the E-Panel is still lying horizontal on a table. Do as much of the additional
wiring as possible before hanging the E-Panel on the wall. The following pictures show some of
the operations that can be done “on the bench” where access is optimal.
Field installed breakers
should be torqued to 20
inch pounds, thenre-
torquedafter one hour.
This is important! Wires
cold flow and sometimes
loosen up after the initial
tightening, so don’t skip
this step. E-Bay is a good
source for Sturdevant
Richmont torque screw
drivers if you are an
installer.
Be careful not to dislodge
larger knockouts on
concentric knockouts
Pre-tap inverter
mounting holes using a
#3 Philips screwdriver
and thread forming
screws supplied
Attach inverter to door,
but don’t hang it on the
chassis until all other
wiring is done
Break off circuit breaker
tabs. Two per breaker
Check fit for any burrs
Attach bottom mounting
bracket










