25 | P a g e 10- 234- 1 R E V : A
SMA DUAL SUNNY ISLAND OFF GRID HYBRID
BATTERY / GENERATOR OR GRID CONNECTED UPS SYSTEM
DRAWN BY T.
CARPENTER
1/31/13
L2 OUT
L2 IN
NEUTRAL
NEUTRAL
NEUTRAL
INVERTER 2
SLAVE
SUNNY
ISLAND
175
ON
OFF
ON
OFF
60
A
GROUND
HOT OUT
HOT IN
GROUND
BATTERY
NEGATIVE
BATTERY
POSITIVE
+
-
GROUND
L1 OUT
L1 IN
L2 OUT L2 IN
NEUTRAL
NEUTRAL
NEUTRAL
INVERTER 1
MASTER
SUNNY
ISLAND
GROUND
HOT OUT
HOT IN
175
ON
OFF
ON
OFF
60
A
GROUND
BATTERY
NEGATIVE
BATTERY
POSITIVE
+
-
GROUND
ON
OFF
60
A
ON
OFF
60
A
AC INPUT
AC INPUT
AC OUTPUT
AC OUTPUT
ON
OFF
ON
OFF
6060
ON
OFF
ON
OFF
60 60
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
LOADS
120/240V
NORMAL
BYPASS
SPD
300
SPD
300
6V
400ah
6V
400ah
6V
400ah
6V
400ah
6V
400ah
6V
400ah
6V
400ah
6V
400ah
6V
400ah
BATTERY 48 V
GRID OR
GENERATOR
POWER SOURCE
NOTE: GROUND AND
NEUTRAL CONNECTIONS TO
EXTERNAL PANELS HAVE
BEEN OMITTED FOR CLARITY
THESE MUST OF COURSE BE
INSTALLED IN THE FIELD
Typical complete dual system. Parts sold separately.