Specifications

SECTION IV
MAINTENANCE / SERVICE
MA206
2
-01
1
2
3
4
5
6
7
8
Figure 4-18. Thermostat Removal / Installation
B. Installation
(1) Slide thermostat (8) into bracket (6) and rotate
terminals (3 and 4) to a horizontal position.
(2) Position bracket (6) against pressure vessel (7)
and secure by tightening two nuts (5).
(3) Connect wires (1 and 2) to terminals (3 and 4).
(4) Install base inspection cover (Refer to
para 4.6).
(5) Refill condensing tank with distilled water.
NOTE
The holes for the two screws (1) are oblong. Install
screws at the top of each hole first, then adjust
downward as necessary if door will not open.
(4) Position pulse solenoid (2) on pressure vessel
bracket (6) and secure in position using two
screws (1).
(5) Install control PC board (Refer to para 4.13).
4.16 Thermostat Removal / Installation
A. Removal
(1) Drain water from condensing tank.
(2) Remove base inspection cover (Refer to para
4.6).
(3) Tag and disconnect wires (1 and 2, Figure 4-18)
from terminals (3 and 4).
(4) Loosen two nuts (5) and pull top of bracket (6)
approximately 1 in. from pressure vessel (7).
(5) Rotate terminals (3 and 4) to a vertical position
and slide thermostat (8) upward and out of
bracket (6).
MA2060-01
PLUNGER
1
2
3
4
5
6
7
Figure 4-17. Pulse Solenoid Removal / Installation
© Midmark Corporation 2002 SF-1827 Page 4-14 Printed in U.S.A.
Return To Table Of Contents