Specifications

SECTION IV
MAINTENANCE / SERVICE
(4) Remove two screws (1, Figure 4-5) and base
inspection cover (2) from base (3).
B. Installation
(1) Install base inspection cover (2) on base (3) and
secure using two screws (1).
(2) Turn sterilizer upright.
(3) Refill condensing tank with distilled water.
4.7 Bellows Assembly Removal /
Installation
NOTE
Figure 4-6 shows old-style bellows. The procedure for
the new-style is the same.
A. Removal
(1) Remove back panel (Refer to para 4.5).
(2) Disconnect tube (1, Figure 4-6) from tee (2).
(3) Pull downward on bellows assembly (3) to
remove bellows assembly from condensing
tank (4).
(4) Loosen and remove tubes (1 and 5) from
bellows assembly (3).
MA2053-01
1
2
3
4
5
TUBE
HOLE
Figure 4-6. Bellows Assembly
Removal / Installation
B. Installation
(1) Connect tubes (1 and 5) to bellows assem-
bly (3).
(2) Position bellows assembly (3) and insert tube
(5) into tube hole of condensing tank (4).
(3) Connect tube (1) to tee (2).
(4) Install back panel (Refer to para 4.5).
© Midmark Corporation 2002 SF-1827 Page 4-4 Printed in U.S.A.
MA2052-01
1
2
3
Figure 4-5. Base Inspection Cover
Removal / Installation
Return To Table Of Contents