Instructions
Table Of Contents
2 of 3
P/N 10435200 Rev AA1 7/22/21
Midmark Corporation
For contact information, go to :
www.midmark.com
5. While holding the retainer with a 1/2-inch wrench rotate the
flip lever assembly so it points away from the center of the
absorber top, see photo. Repeat other assembly.
6. Insert the 3/16-inch long #4 setscrew into each of the retainers
and tighten. (0.05-in hex wrench supplied)
7. With the flip lever assembly still in the locked (down) position
insert the 1/8-inch long #6 setscrew into the lower threaded
opening of each bushing and tighten. (1/16-in hex wrench
supplied)
8. Open the flip lever assembly, insert the 1/8-inch long #6 setscrew
into the upper threaded hole of each bushing and tighten.
9. While holding the retainer with a 1/2-inch wrench, thread the
acorn nut (taken off in step 1) onto the tie rod and tighten the
acorn nut using a 7/16-inch wrench. Repeat for other tie rod.
10. Perform a leak test to verify system integrity (see page 3). Note:
leak(s) may not be related to installing lever kit.
To operate the flip levers push VMS canister assembly top down and hold. Push flip levers down to lock
position. On VA units push both flip levers down simultaneously. To open, push levers up.
In the event that the flip lever assembly needs to be tightened, remove the acorn nut and set screws, tighten
the retainer an additional 1/8 to 1/4 turn with a 1/2-inch wrench (see step 4), then repeat steps 5 through 10.