Operating Instructions and Installation Instructions

5
3. INSTALLATION METHOD
Connect the female joint of the wires group from the mainboard
with the male joint of the connective wires group. (See Fig.3-3(A))
Connect the other side of the connective wires group with the male
joint of the wires group leads from the wire controller.(See Fig.3-3(A))
Fig 3-3(A)
Mainboard
4-core shielding wire
3.Wiring figure
Model A:KJR-120G2/TFBG-E(12V)
Model B:KJR-120G1/TFBG-E(5V)
The connection cable
CN40
Fig 3-3(B)
Adapter board
Display board
4-core shielding wire
The connection
cable
CN101