Specifications

130BC525.10
Illustration 5.31 Recommended Lifting Method, D-frame Size
176FA245.10
Illustration 5.32 Recommended Lifting Method, E-frame Size
130BB688.10
Illustration 5.33 Recommended Lifting Method, Frame Sizes
F1, F2, F9 and F10
130BB689.10
Illustration 5.34 Recommended Lifting Method, Frame Sizes
F3, F4, F11, F12 and F13
130BB753.10
Illustration 5.35 Recommended Lifting Method, Frame Size F8
NOTICE
The pedestal is packaged separately and included in the
shipment. Mount the frequency converter on the
pedestal in its final location. The pedestal allows proper
airflow and cooling to the frequency converter. See
5.1.5 Pedestal Installation of F-frames.
How to Install VLT® HVAC Drive FC 102 Design Guide
98 MG16C102 - Rev. 2013-08-20
5
5