Installation guide

HARDWARE INSTALLATION
18
2.1 Installing an Subsystem into the Rack
or Tower (Option)
1. Using supplied screws to secure the mounting-bracket rail and
length rail and then secure them on the front vertical rail and rear
vertical rail, as shown below. Make sure that all connections are
tightened before continuing.
2. Slide the rear side of subsystem fully onto the rack until the sub-
system front panel touched the front vertical rails. Align the mount-
ing holes of the subsystem on the front vertical rail holes. Secure
the subsystem to the front vertical rail and mounting-bracket rail
on both sides. The subsystem is too heavy; it needs some assis-
tance from other people to lift it onto the rack together.