Operating instructions
TM 11574A-OI
2-17
IV.
OPERATING CHECKS
2-12. Before, During, and After Operation Checks
WARNING
Beware of unexpected starting of the fans motors. The unit may cycle the fan motors as
control requirements dictate.
Table 2-2. Before, During, and After Operation Checks
Interval Item
Action
EXTERIOR
Before Cargo Doors Inspect hardware for bent or broken door release handles.
Before Rear Doors Inspect hardware for bent or broken door release handles.
Before Refrigeration Unit Check refrigeration unit for security.
Install and secure loose or missing mount bolts.
Before Evaporator Fan Check for dirt or grease on evaporator fan or fan deck and clean if
necessary.
Before Evaporator Coil Check evaporator coil for cleanliness or obstructions.
Wash with fresh water.
Before Defrost Drain Pans
and Lines
Check defrost drain pans and drain lines for obstructions and clear if
necessary. Wash with fresh water.
Before Condenser Coil Check condenser coil for cleanliness.
Wash with fresh water.
Before Control Box Open control box door. Check for loose electrical connections or
hardware.
Before Electrical Cables Check electrical cable for cuts, deep abrasions, burned or discolored
wiring.
Before Moisture-Liquid
Indicator
Check color of moisture-liquid indicator.
Before Compressor Check oil level in compressor sight glass.
Before Condenser/
Evaporator Fans
Check rotation of condenser and evaporator fans.