Datasheet

PIC18F2XK20/4XK20
DS40001303H-page 386 2010-2015 Microchip Technology Inc.
FIGURE 26-22: A/D CONVERSION TIMING
TABLE 26-36: A/D CONVERSION REQUIREMENTS
Param.
No.
Symbol Characteristic Min. Max. Units Conditions
130 T
AD A/D Clock Period 0.7 25.0
(1)
sTOSC based,
-40C to +85C
0.7 4.0
(1)
sTOSC based,
+85C to +125C
1.0 4.0 s FRC mode, V
DD2.0V
131 T
CNV Conversion Time
(not including acquisition time) (Note 2)
12 12 TAD
132 TACQ Acquisition Time (Note 3) 1.4 sVDD = 3V, Rs = 50
135 T
SWC Switching Time from Convert Sample (Note 4)
136 TDIS Discharge Time 2 2 TAD
Legend: TBD = To Be Determined
Note 1: The time of the A/D clock period is dependent on the device frequency and the TAD clock divider.
2: ADRES register may be read on the following TCY cycle.
3: The time for the holding capacitor to acquire the “New” input voltage when the voltage changes full scale
after the conversion (V
DD to VSS or VSS to VDD).
The source impedance (Rs) on the input channels is 50

4: On the following cycle of the device clock.
131
130
132
BSF ADCON0, GO
Q4
A/D CLK
A/D DATA
ADRES
ADIF
GO
SAMPLE
OLD_DATA
SAMPLING STOPPED
DONE
NEW_DATA
(Note 2)
987 21 0
Note 1: If the A/D clock source is selected as RC, a time of T
CY is added before the A/D clock starts.
This allows the SLEEP instruction to be executed.
2: This is a minimal RC delay (typically 100 ns), which also disconnects the holding capacitor from the analog input.
.. .
. . .
TCY