Datasheet
© 2009 Microchip Technology Inc. DS39682E-page 335
PIC18F45J10 FAMILY
TABLE 24-25: A/D CONVERSION REQUIREMENTS
Param
No.
Symbol Characteristic Min Max Units Conditions
130 T
AD A/D Clock Period 0.7 25.0
(1)
μsTOSC based, VREF ≥ 2.0V
131 TCNV Conversion Time
(not including acquisition time) (Note 2)
11 12 TAD
132 TACQ Acquisition Time (Note 3) 1.4 — μs-40°C to +85°C
135 TSWC Switching Time from Convert → Sample — (Note 4)
Note 1: The time of the A/D clock period is dependent on the device frequency and the T
AD clock divider.
2: ADRES registers may be read on the following T
CY cycle.
3: The time for the holding capacitor to acquire the “New” input voltage when the voltage changes full scale
after the conversion (V
DD to VSS or VSS to VDD). The source impedance (RS) on the input channels is 50Ω.
4: On the following cycle of the device clock.