Instruction manual

Startup
continued
RFT9739 Field-Mount Transmitter Instruction Manual
61
Output Wiring Startup TroubleshootingBefore You Begin Getting Started Mounting
Power-Supply and
Sensor Wiring
6.6 Process measurement
After flowmeter zeroing has been completed as described in
Section 6.4
, page 57, the flowmeter is ready for process measurement.
WARNING
Operating the transmitter without covers in place
exposes electrical hazards that can cause property
damage, injury, or death.
Make sure the safety barrier partition, electronics module
cover, and housing cover are securely in place before
operating the transmitter.