Operating instructions
MICRO PANEL XV-102 3.5" 5. Installation
M002869-02, 07/2009 23
5.3.2 Preparation of cables with D-Sub connector
The preparation of bus cables is an essential factor in ensuring reliable operation and electromagnetic
compatibility (EMC).
Wiring requirements
#
##
# The cables must be shielded.
#
##
# The cable shield must be made from a copper braid.
#
##
# The cable shield must make a low impedance connection with the connector casing over a large
contact area. This is achieved by:
#
##
# Use of metal or metallized connector casings with a cable clamp for strain relief.
#
##
# The cable clamp must be screwed securely to the connector.
Connecting the cable
shield
1 Strip the cable end so that approx. 3 cm of the shield braid is exposed.
2 Fold back the shield braid over the cable shield.
3 Fit approx. 3 cm of heat shrinkable tubing over the folded back end of the shield braid or use a
rubber grommet.
#
##
# 5…8 mm of the shield braid must be exposed at the cable end.
#
##
# The folded back shield braid end must be covered by the heat shrinkable tubing or by the
rubber grommet.
4 Fit the D-Sub connector to the cable end:
#
##
# The exposed metal shield braid must be clamped to the connector casing with the cable clamp.
Fig. 4 Connecting the cable shield
Fig. 5 Cable prepared with D-Sub connector
A Cable with cable sheath
B Heat shrinkable tubing or rubber grommet
C Cable clamp
D Shield braid
E D-Sub connector
F Fixing screw UNC
30 mm
5…8 mm
1
2
3
ABCDEF