Specifications

MCSBMSGATEWAYStartupGuide Revision4.0
MicroControlSystems5580EnterprisePkwy,FortMyers,FL33905USAWeb:www.mcscontrols.com
Tel:(239)6940089Fax:(239)6940031
12
3.3 Wiringthe MCSBMSGATEWAY FieldPortto aLonWorksnetwork
Connect the MCS BMSGATEWAY to the field network with the LonWorks terminal using a twisted pair
nonshieldedcable.LonWorkshasnopolarity.
.
3.4 PowerUptheMCS BMSGATEWAY
Apply power to the device. Ensure that the power supply used complies with the specifications provided in
Appendix B.1.Ensure that the cable is grounded using the “FrameGND” terminal.The MCSBMSGATEWAY is
factorysetfor930VDCor1224VAC.
VoltagePinouts
MCSBMSGATEWAYPin# Pinassignment
Pin1 RS485+
Pin2 RS485‐
Pin3 RS485GND
Pin4 V+
Pin5 V‐
Pin6 FRAMEGND (FG)

MCSBMSGATEWAYPin# Pinassignment
Pin1 Lon+
Pin2 Lon‐
Pin1
Figure7Lonworksnetworkwiring
Figure8WiringthepowertotheMCSBMSGATEWAY
Pin1