Operating instructions

28 Operator's Manual
MAINTENANCE
*The pump oil must be changed after the rst 50 hours of operation and every 250 hours or 3 months, whichever
comes rst.
PREVENTIVE OPERATOR MAINTENANCE CHART
DEALER MAINTENANCE CHART
PROCEDURE DAILY 3 MONTHS 6 MONTHS 9 MONTHS 12 MONTHS
Gas leak inspection X
Water leak inspection X
Oil leak inspection
Quick-connect and hose inspection X
Check pump oil level X
Change pump oil* X X X X
Check belt tension X X X X
Replace high pressure nozzle X X X X
Test water pressure X X
Test water temperature X X
PROCEDURE 12 MONTHS
Gas supply inspection X
Clean gas line drip legs X
Burner inspection X
Exhaust ventilation inspection X
Descale coil* X
Test Voltage & Amp Draw X
*Scale build-up will vary with mineral content in the
water and amount of usage. Descaling can range
from monthly to yearly maintenance.