Specifications
68D5001
7
• Framing
Figure 4 shows a typical framing of the heater using combustible materials. All
required clearances to combustibles must be adhered to. Header height is measured
from the base of the heater.
Tools and building supplies required for installation:
• Saw • Square
• Pliers • Gloves
• Hammer • Level
• Philips screwdriver • Surround
• Framing materials • Electric drill/bits
• Tape measure
• Wall-finishing materials
• Caulking material
96M”
27”
26”
FP2389
framing
1/2” - 3/4”
FP2390
mantel depth
FP89
FP90
Figure 4
NOTE: The height that a com-
bustible mantel is fitted above the
heater is dependent on the height
of the front selected. The minimum
height is 1" above the front.
• Installing as Insert
Once the site has been prepared, your fireplace insert can be installed.
1. Make sure power switch is in the OFF position.
. Plug fireplace into a 15-amp/10 Volt, grounded outlet.
. Push fireplace insert so trim is against finished mantel or wall surface.
CAUTION: Provide
adequate clear-
ances around the
air openings and adequate
accessibility clearances for
servicing and proper opera-
tions.