Operating instructions

33D4051 19
H
J
Nail Sides
Through Nailing
Flanges
1. Bendoutthenailingangeslocatedoneachsideoftherebox.
2. Slidethereboxintopreparedframingorpositionreboxinitsnalpositionandframelater.
3. Levelthereboxbycheckingthetopedgeoftherebox.Shimifnecessary.
4. Anchorreboxtothesideframingmembersusing8dnailsorothersuitablefasteners.See Figure 26.
5. The canopy must be installed for safe operation of the heater. See page 14 for canopy installation details.
Whennishingacustomcabinet,mantel,orotherbuilt-inenclosure,
theopeningsizetoaccommodatethereplacewithtriminstalledis
as follows:
FIREPLACE FRAMING
24VFSC w/ trim 24DBXC w/ trim 32VFSC w/trim
H 25 " 25" 32
13
/16 "
J 26
3
/4 " 26
3
/4 " 31
1
/4 "
Figure 25 - Custom Cabinet
Figure 26 - Location of Nailing Flanges
WARNING
The replace must be installed giving full
consideration to the clearance and height
requirements identied in this manual.