Technical data

38
STRATA2
(Prog #) Description of Prog # Range Preferred setting
51 Minimum output % reached prior to 5..100 40
cascade switching modules Off
52 Maximum output % reached prior to 5..100 80
cascade switching modules On
56 Time spent by module on ignition rate prior 0..1200 0
to modulation. (delay time between modules)
60 Minimum temperature difference between
flow and return temperature 0..20 2
Configuration of Plant OEM
90 Display default 0..1 0
0 Day # Time of day
1 System flow temperature
91 Software version 00.099.9
92 RVA 47 controller operation hours 0.500,000
Table 12
7.3 OEM parameter setting (contd)
8.0 maintenance
and inspection
The frequency of servicing will depend upon particular conditions and usage, however for general
guidance, maintenance/inspections should take place at least every 12 months. Prior to carrying out any
required maintenance, the unit must be inspected.
8.1 inspection
Complete the following steps before commencing inspection:
Ask the user for any problems with the Central Heating unit or any other comments regarding the
appliance.
Check the water pressure and treatment level of the installation.
Remove the casing of the unit and inspect all pipes and connections for water leaks.
Open the syphon rinsing pipe at the back of the boiler.
Run the unit at maximum capacity and measure the load or the CO
2
.
Run the unit at minimum capacity and measure the load or the CO
2
.
Listen to the sound of the module pump.
Disassemble the burner by removing the six M6 bolts, removing the ignition cable and disassembling
the two combustion fan cables.
Inspect the combustion fan blades.
Check the spark between the electrode and the burner this should be between 5 and 6mm.
Check the interior of the heat exchanger for any contamination.